ENABLING WORKS | FIT-OUT

Flannels | Braehead

Client | Flannels

Location | Brahead

Value | Undisclosed

Timing | March 2022 –June 2022

Project Overview:

The fit-out of a new Flannels retail store at Braehead Shopping Centre involved comprehensive installation of Mechanical and Electrical (M&E) systems, as well as the incorporation of high-end finishes to meet the client's exact specifications. The project was completed within a stringent timeframe of 16 weeks, all while operating within a live shopping centre environment.

  • Ceramic floor tiles removed and adhesives ground back to substrate throughout.

  • Unit stripped back to shell including all M&E services back to incoming supplies.

  • Existing centre management services maintained at all times.

  • New Sprinkler System designed & installed.

  • Formation of new stockrooms & RFID system.

  • Complete new Mechanical and Electrical Services.

  • Bespoke Niches and bulkhead constructed and finished with Durafinish.

  • New Doors & Frames to new and existing opens.

  • New Marble, Hardwood and Ceramic floors.

  • New glass shopfront with Iconic black aerofoil fin detail, unique to Flannels.

  • Combination of multiple different floor finishes (tiling, carpets, timber).

  • Various suspended mirrored ceiling features.

  • Multiple client appointed trades co-ordinated.

The fit-out of the new Flannels retail store at Braehead Shopping Centre exemplifies the successful execution of a complex project within a demanding environment. Through meticulous planning, skilled craftsmanship, and effective communication, the project was delivered on time and to the highest standards, showcasing the capabilities of the project team and satisfying the client's expectations.

 
Previous
Previous

Chiltern Grange Care Home

Next
Next

Multi-fascia | Blackpool