Flannels | Merry Hill, Birmingham.
Client | Flannels
Location | Merry Hill, Birmingham
Value | £1.1M
Timing | 8 weeks
Approached by our blue chip retail client to mobilise and commence on site within 4 working days, we initially negotiated the stripping out and enabling project. Shortly after works commenced on site, the design for the Fit Out package was released and the extent of the works agreed, negotiated and commenced. The fit out of the Flannels store was to be the first of many with a complete new design concept, previously untried or tested by our client.
As part of the works, new Mechanical, Sprinkler, Electrical and data services were installed.
Floor screeds were removed to suit various new Resin, Marble and Timber floor finishes and bespoke ceiling and wall features were designed and installed throughout.
The entire soffit and walls were decorated (where not covered by the prefinished Durafinish plaster) including wallpaper to feature walls. The project was a pioneering design for the clients brand moving forwards and incorporated a significant number of design changes and alterations, all of which were incorporated within the original time scale. Clients fit out teams were still managed and incorporated within the original construction phase programme.
Summary of works:
First new Flannels brand to be installed in any store
190m2 of screed removed, disposed of and made good. Recesses formed for multiple new floor finishes
Entire floor fitted with new Sprinkler System
Unique ceiling features designed and installed
Bespoke recesses, Niches and features created to co-ordinate with new shop fit design
Open lattice metal ceiling rafts installed as part of ceiling feature
New glazed shop front and Aerofoil fin features
Complete new lighting and power installation
New concrete effect Resin floors laid (outside recesses for flooring features)
Bespoke Marble, timber and carpet floor finishes introduced into new screed recesses