STRIP OUT | ENABLING WORKS
Former Argos store | Plymouth.
Client | Frasers Group
Location | Plymouth
Value | £280,000
Timing | 5 weeks
The Main Roof was treated with a new overlay system comprising of new insulation and new Icopal roof finishes, which provides the client with the security of a 10 year insurance backed guarantee. The existing front Facade was cleaned and repaired, including the first and second floor levels above an adjacent ground floor retail unit.
Internally, new apertures were formed within the existing concrete slab which required new structural trimming steels for both the new bespoke Platform lift and customer staircase, the installation of which also formed part of the works. New partitions were erected to form the new stairwell for the clients future fit out contractors and all windows and doors were eased, adjusted and decorated.
Summary of works:
New DDA compliant Platform Lift
Large Structural openings formed in floor slab
Bespoke Steel Staircase Stainless Steel
Handrail and glass balustrade
New roof overlay system providing 10 year Insurance backed guarantee
Lightning Protection replacement
Front Fagade
Stone cleaning and repairs Floor finish removals