STRIP OUT | ENABLING WORKS
9-15, Parliament Row Hanley | Stoke on Trent
Client | Frasers Group
Location | Stoke on Trent
Value | £2.4M
Timing | 27 weeks
The existing store was initially completely stripped of the existing Asbestos (approx. value Circa £750K) which was located throughout the entire building and the building made safe prior to strip out and demolition works commencing. Large structural openings were formed in the existing concrete floor slabs for the installation of a new customer steel staircase and new customer passenger lift, using a combination of diamond drilling and saw cutting, crash decks and rubble removal. A new lift pit and lift shaft were formed within the new proposed entrance foyer. The shop front was stripped out from behind our secure hoarding and a new shop front designed and installed to suit the proposed fit out works, this included structural steel members to support the new entrance foyer.
The main roof was overlaid with a new Bauder felt roofing system, providing the client with an insurance backed guarantee for the integrity of the roof finishes.
With security being a top priority, new high security doors, frames and roller shutters were installed to all perimeter openings.
Summary of works:
Full strip out and demolition works throughout
Specialist wet diamond saw cutting and drilling
Design and installation of Structural Steelwork
Large openings formed in concrete slabs for stairs and escalators
Lift Pit excavations for new passenger lift
Blockwork lift shaft constructed
New Access/Egress and staircase lobbies formed