ENABLING WORKS | FIT-OUT
Flannels | Southampton.
Client | Frasers Group PLC
Location | Westquay, Southampton
Value | £1,634,000
Timing | 16 weeks
Nature of works
The strip out, enabling works and fit out of the Flannels Store was awarded to us in June 2021 and the works were completed in November 2021, in advance of Christmas trading.
Careful co-ordination and communication with Centre Management created an excellent working relationship and ultimately lead to a successful project, completed within budget and programme. The store was then used by the client as a benchmark for standards moving forward which is testament to the quality of finish we produced.
Works carried out
All works carried out within an operational shopping centre
Existing H&M shop fit completely removed including M/F ceiling
Ceramic floor tiles removed and adhesives ground back to substrate throughout
Unit stripped back to shell including all M&E services back to incoming supplies
Existing centre management services maintained at all times
New Sprinkler System installed
Complete new Mechanical and Electrical Services
Bespoke Niches and fascias constructed and finished with Durafinish
New Doors & Frames to new and existing opens
New glass shopfront with Iconic black aerofoil fin detail, unique to Flannels
Combination of multiple different floor finishes (tiling, carpets, timber)
Various suspended mirrored ceiling features
Multiple client appointed trades co-ordinated